WhatsApp — Salicru UPS Pricing
Salicru UPS Dubai — online double conversion UPS systems UAE
Salicru SLC online UPS system Dubai server room
Salicru SLC · Online UPS Dubai · 1kVA to 600kVA · Single & Three Phase

Salicru UPS Dubai. You're Probably Paying 25% More for UPS Protection Than You Need.

Most online UPS systems carry a power factor of 0.8. That means a 10kVA unit only delivers 8kW of real power. Every Salicru SLC UPS carries PF=1 — the kVA you buy is the kW you get. Same load. Same protection. Lower cost. We'll show you the numbers.

Spain 1965
Dubai Stock
PF=1 on Core Models
1kVA to 600kVA
CE Certified
130+ Countries
60
Years UPS Engineering
PF=1
Full kVA = Full kW
<3%
Input THDi
99%
Eco Mode Efficiency
CE
European Certified

The Number Nobody Explains

Your 10kVA Online UPS Might Only Be Delivering 8kW

When you buy a double conversion UPS in Dubai, the headline number is kVA — 6kVA, 10kVA, 20kVA. What most suppliers don't explain is that kVA is not the same as kW. The difference between them is the power factor.

Most online UPS systems carry a power factor of 0.8. That means a 10kVA UPS delivers 10 × 0.8 = 8kW of real power to your servers and equipment. To protect a load of 10kW, you need to buy a 12.5kVA unit — the next tier up, at a higher price.

The core Salicru SLC range — the TWIN RT3, CUBE4, and ADAPT2 — carries an output power factor of 1. That means the kVA rating and the kW capacity are the same number. A 10kVA Salicru SLC CUBE4 delivers 10kW of real power. No gap. No hidden shortfall. No reason to buy the next size up.

The Same 10kW Server Room Load — Two Different Purchases

UPS with PF=0.8 · to protect 10kW you need 12.5kVA unit — larger, more expensive
Salicru SLC with PF=1 · to protect 10kW you need 10kVA unit — exact match, lower cost
The saving on every UPS you size correctly One full model tier

The input power factor also matters for your building. The Salicru SLC CUBE4 has input PF > 0.99 — it draws almost no reactive power from the building's electrical supply. For a data centre or server room on a commercial DEWA contract, reactive power draw can create penalties. A near-unity input power factor means the UPS is invisible to your upstream electrical infrastructure.

This is why Salicru's online UPS range costs what it does. Not because the components are more expensive. Because you need fewer of them.

Buying a UPS for your server room or data centre in Dubai? WhatsApp us the load in kW and the phase supply. We calculate the correct Salicru SLC model, confirm UAE stock, and return AED pricing the same day — no obligation.

What the Spec Sheet Doesn't Say

Eight Things Worth Knowing Before You Buy an Online UPS in Dubai

These are the engineering decisions that determine how a double conversion UPS performs in UAE conditions over five years — not on a European test bench on day one.

01 — Inverter Topology
Three-Level IGBT — Why the Architecture Matters for Non-Linear Loads

The SLC CUBE4, CUBE3+ and ADAPT2 use three-level NPC inverter topology with 4th-generation Trench Gate IGBT technology. Two-level topology switches at the full DC bus voltage on each cycle. Three-level topology switches at half that voltage, producing lower heat, lower stress on the semiconductors, and significantly cleaner output.

For a Dubai server room or data centre running blade servers, virtualised infrastructure and switching power supplies — the load is non-linear. Three-level topology produces output THDv below 0.5% on linear loads and below 1.5% on non-linear. Clean enough that equipment running from the UPS receives power cleaner than the grid typically provides.

The result: lower heat inside the inverter, longer component life, and output quality that sensitive electronics prefer.

02 — Input Harmonics
THDi <3%: The UPS That Doesn't Fight Your Building's Electrical Infrastructure

Every online double conversion UPS draws current from the building's electrical supply. Most draw it in pulses that create harmonic distortion — THDi of 10–30% is common. That harmonic current flows back through the building's neutral cable, through the distribution transformer, and through every other device sharing the same supply.

Harmonic current in neutral cables causes them to run hot — sometimes above their rated capacity. It reduces transformer efficiency and rated load capacity. It can trip sensitive protection circuits.

The Salicru SLC CUBE4 has input THDi confirmed below 3% at rated load. The three-phase IGBT full-wave rectifier with PFC draws current continuously and smoothly. The UPS draws power as if it were a perfectly linear, resistive load. Your building's electrical infrastructure never knows a large UPS is there.

03 — Battery Intelligence
Batt-Watch: The Feature That Tells You the Battery Is Failing Before the Outage Does

The moment most businesses discover their UPS battery has failed silently is the moment the power cuts. The UPS switches to battery — and the battery lasts 3 minutes instead of 15. By then it is too late.

Every Salicru SLC CUBE4 includes Batt-Watch — a continuous battery management system that monitors health across the full charge cycle, adjusts charging voltage and current based on temperature and battery age, and generates advance warnings as degradation is detected. It supports VRLA, lead-acid, gel, Ni-Cd, and lithium-ion — all chemistries.

The UAE-specific problem: at 35°C ambient, a sealed lead-acid battery ages roughly twice as fast as it would at 25°C. A 5-year rated battery may fail in under 3 years in a Dubai plant room. Batt-Watch measures the actual degradation rate, not the calendar date. The UPS tells you. The outage doesn't have to.

04 — Modular Architecture
Hot-Swap Expansion: Adding Capacity Without Taking Your Server Room Offline

The question a data centre operations team eventually faces: the load has grown beyond the current online UPS capacity. A new module is required. The server room cannot go down. The UPS cannot go to bypass.

The Salicru SLC ADAPT2 modular UPS is built for exactly this moment. Each power module has its own independent rectifier, inverter, battery charger and DSP controller. When you slide a new module in from the front panel during live operation, the cabinet controller detects it, runs self-test, and begins sharing the load automatically — in full view of the protected equipment, which never experiences a voltage variation.

Front-panel extraction means no rear-access cable clearing in a live rack. A module can be removed and replaced in minutes without tools and without touching a cable run. MTTR (mean time to repair) drops from hours to minutes. For a server room or data centre in Dubai that cannot afford a maintenance window — this is the architecture.

05 — Remote Monitoring
NIMBUS: Your Entire UPS Fleet on One Screen — Not One Login Per Building

A facilities manager with UPS systems across three commercial buildings in Dubai has the same problem every time: each UPS needs a separate site visit to check status, and the first sign of a battery problem is usually the beeping alarm at 2AM.

NIMBUS is Salicru's IoT monitoring platform — free, no subscription, no licence. It uses MQTT protocol, runs on an embedded Linux NIMBUS card in the UPS, and communicates via the native Ethernet port or optional WiFi. Every unit in your account is visible on one screen: real-time load, battery state of charge, input and output voltage and frequency, alarm status.

Push notification the moment anything is outside normal parameters. Remote battery test without a site visit. 40-day alarm log. Integration into any existing building management or DCIM platform via standard protocols. SSL encryption with the client's own digital certificates. The UPS fleet monitors itself — you get notified when something needs attention, not when it fails.

06 — Peak Shaving
The SLC CUBE3+ PS: A Three-Phase UPS That Reduces Your DEWA Bill

Your DEWA commercial electricity bill has a line that many operations managers don't fully understand: the demand charge. It is calculated based on the highest power draw recorded at any 15-minute interval in the billing month. One afternoon when everything was running simultaneously — the HVAC, the production line, the servers — set that peak and determined the demand charge for the entire month.

The Salicru SLC CUBE3+ PS three-phase UPS includes a built-in peak shaving function. You set a maximum grid consumption threshold — any value between 10% and 100% of your load requirement. When total demand exceeds that threshold, the UPS automatically discharges its battery to keep grid draw at or below your set point. When demand drops, the battery recharges.

The demand charge on your DEWA bill is capped by design, not by chance. A UPS that pays through your electricity bill every month — not only through the cost of the outage it prevents.

07 — Frequency Conversion
50Hz Input, 60Hz Output — No Separate Converter Required

UAE electrical supply runs at 50Hz. A meaningful portion of industrial and laboratory equipment imported from North American markets is rated for 60Hz. Running 60Hz equipment on 50Hz supply reduces motor speed, changes timing-sensitive processes, and can cause overheating in equipment designed for 60Hz cooling fans.

The Salicru SLC TWIN RT3 online UPS supports a dedicated frequency converter mode. Input at 50Hz, output at 60Hz. Or input at 60Hz, output at 50Hz. One unit provides both power conditioning and frequency conversion simultaneously — eliminating the need for a separate rotary or static frequency converter.

Note on sizing: output power is derated in frequency converter mode — a 5kVA unit delivers approximately 2kVA in this mode. Correct load assessment before ordering is important. We advise on this case by case — WhatsApp us the equipment load and we confirm the right SLC TWIN RT3 model.

08 — Efficiency and Generator Bridge
99% in Eco Mode. And It Works With Your Diesel Generator.

An online UPS system running 24 hours a day in full double-conversion mode consumes power even when the grid is stable. The SLC CUBE4 achieves over 96% efficiency in online mode — already excellent — and over 99% in eco mode, where the inverter stays in warm standby and the load passes through with the inverter ready to take over in milliseconds if the supply degrades.

For facilities with a diesel generator: the Salicru three-phase UPS range is confirmed generator-compatible. The UPS bridges the 4 to 8 seconds between grid failure and generator startup — providing clean, uninterrupted power throughout. Once the generator is stable, the UPS transfers load to generator supply automatically. When the generator switches off and grid is restored, the UPS again absorbs the transition, preventing the transients from reaching connected equipment in either direction.

For a Dubai industrial facility or hospital running both grid and generator — this is the complete power continuity solution without additional hardware.

Two Types of UPS Buyer

Your Server Room or Your Building — Both Need a Different Conversation

An IT manager protecting a rack of servers in a Dubai office has different concerns from a facilities manager protecting three-phase industrial equipment on a 400V supply. The Salicru SLC range covers both — but the right starting point depends on which problem you are solving.

Server Room · IT Infrastructure · Single Phase

Your servers need a rack-mount UPS that fits, performs, and doesn't beep at midnight

Your server rack is in a standard 19-inch cabinet. Depth matters — the cable runs behind the UPS need space to breathe. The SLC TWIN RT3 online UPS was designed for exactly this constraint: 2U height, only 600mm depth, with variable-speed dual fans managing heat front-to-rear without noise.

It protects IT servers, voice and data networks, ERP systems, CRM platforms, document management systems and video streaming infrastructure. True online double-conversion — the output is generated entirely by the inverter, isolated completely from grid disturbances and frequency variations. Your servers receive cleaner power from the UPS than from the grid.

The lithium-ion version — SLC TWIN RT2 LION — runs for 10 years without battery replacement. Lithium-ion delivers 10x the discharge cycles of standard VRLA at the same size and performs reliably up to 40°C, meaning your plant room temperature doesn't affect battery life the way it does with sealed lead-acid. For a server room UPS in Dubai that you don't want to think about for a decade — this is the specification.

IoT monitoring native: the SLC TWIN RT3 has a built-in Ethernet port and optional WiFi. NIMBUS app shows every unit in your account on one screen. Push notification on any alarm. Remote battery test without visiting the room.

Models for this application
SLC TWIN RT2 LION · 1–3kVA · Lithium-ion · 10-year battery life
SLC TWIN RT3 · 1–10kVA · IoT native · PF=1 · 600mm depth
SLC ADAPT2 · 10–600kVA · Hot-swap modular · Data centre scale
Three Phase · Commercial · Industrial · Data Centre

Your three-phase UPS needs to handle the load, the generator gap, and the DEWA bill

If you're on three-phase 400V supply — a commercial building, manufacturing facility, hospital, hotel, or industrial operation — the three-phase online UPS requirement is more complex than kVA sizing. You need a unit that handles unbalanced loads across phases, bridges cleanly to your generator, and doesn't inject harmonic distortion back into your building's electrical infrastructure.

The Salicru SLC CUBE4 (7.5–80kVA) and SLC CUBE3+ (7.5–200kVA) address all three simultaneously. PF=1 output means you size to the actual kW load, not to 125% of it. THDi below 3% means your neutral cables, distribution transformer and protection relays are unaffected. Generator compatibility is confirmed across the range.

The SLC CUBE3+ PS variant adds active peak shaving — the UPS monitors your DEWA grid demand continuously and discharges the battery when demand approaches your set threshold. For a commercial building in Dubai paying a monthly demand charge, this function reduces that charge every billing cycle.

For data centres or facilities that need to expand UPS capacity without a maintenance window, the SLC ADAPT2 modular industrial UPS scales from 20kVA to 600kVA in a single cabinet, with hot-swap modules that can be added during live operation.

Models for this application
SLC CUBE4 · 7.5–80kVA · Three phase · Batteries internal · Nimbus standard
SLC CUBE3+ · 7.5–200kVA · Three phase · Parallel redundant ×4
SLC CUBE3+ PS · 7.5–200kVA · Peak shaving · DEWA demand reduction
SLC ADAPT2 · 10–600kVA · Modular hot-swap · Pay-as-you-grow

Dubai Stock

Salicru SLC Range — Full Specifications

All models use online double-conversion topology. CE certified for UAE operation at 230V single phase or 400V three phase, 50Hz. PF=1 confirmed on SLC TWIN RT3, CUBE4, and ADAPT2 ranges — see key features column. Prices AED — same-day WhatsApp quote on any model.

Model Phase Power Range Key Feature Efficiency Best For
SLC TWIN RT2 LION Lithium Single 1–3kVA Lithium-ion · 10× cycles · 40°C rated · 10-yr life Online Server rack, network room, office backup
SLC TWIN RT3 IoT Native Single 1–10kVA PF=1 · 600mm depth · Ethernet standard · IoT Online IT rack, ERP, server room, UAE offices
SLC CUBE4 R Three 400V 7.5–20kVA Rackmount · Batteries internal · Nimbus >96% / 99% eco Edge computing, compact server room
SLC CUBE4 Most Popular Three 400V 7.5–80kVA Batt-Watch · THDi <3% · Generator compatible >96% / 99% eco Commercial, data centre, clinic, hotel
SLC CUBE3+ Three 400V 7.5–200kVA Parallel ×4 · Flexible input · Transformerless >95% / 99% eco Large commercial, industrial, telecoms
SLC CUBE3+ PS Three 400V 7.5–200kVA Peak shaving · Threshold 10–100% · PF=0.9 output >95% / 99% eco DEWA demand charge reduction, factories
SLC ADAPT2 Modular Three 400V 10–600kVA Hot-swap · Front access · Pay-as-you-grow >96% Data centre, virtualised IT, critical infra
SLC X-PERT Three 400V 80–400kVA Industrial grade · High ambient tolerance >96% Industrial plant, oil & gas, large telecoms

Not sure which model? WhatsApp us the load in kW, the phase supply (single or three phase), and your backup time requirement. We specify the correct Salicru SLC model, confirm UAE stock, and return AED pricing the same day.

UAE Installation

Three Things That Are Different About UPS in Dubai

European UPS specifications are written for 20°C ambient temperatures, predictable grid quality, and VRLA batteries that achieve rated lifespan. Dubai is different on all three counts. Here is how the Salicru SLC range addresses each.

Heat and Battery Life

VRLA battery capacity degrades faster at elevated temperatures. At 35°C ambient — common in UAE plant rooms and electrical rooms — a battery rated for 5 years in a 25°C environment may require replacement in under 3 years.

The SLC TWIN RT2 LION uses lithium-ion batteries rated for operation up to 40°C, delivering 10× the discharge cycles of VRLA at the same form factor. The SLC CUBE4's Batt-Watch system monitors actual battery health continuously — not estimated remaining life based on calendar date. For any chemistry: you are warned before failure, not by it.

Grid Quality and Phase

UAE single-phase supply is 230V at 50Hz. Three-phase commercial supply is 400V (3×400V) at 50Hz. Every Salicru SLC model we supply is CE-specified for these parameters.

The SLC CUBE4 and CUBE3+ input voltage range is +15% / −20% configurable — the UPS accepts supply variations between 184V and 264V (phase to neutral) before switching to battery. For UAE commercial properties where grid voltage can fluctuate during peak demand periods, this wide input tolerance means the battery is used only when the grid actually fails — not during every voltage dip.

DEWA Tariffs and Demand Charges

DEWA commercial tariffs for medium and large premises include a monthly demand charge based on peak power consumption. One high-demand event — all HVAC, servers and production running simultaneously — sets the demand charge for the entire month.

The SLC CUBE3+ PS three-phase UPS includes a built-in peak shaving function with an adjustable demand threshold. When total load approaches your set limit, the UPS discharges the battery to keep grid draw at or below the threshold. Every month. Without manual intervention. The UPS pays through the electricity bill reduction, not only through the downtime it prevents.

IoT Monitoring · Free

Your UPS System Monitors Itself and Calls You When Something Is Wrong

The standard arrangement for UPS monitoring in Dubai is: wait for the beeping alarm. Then find out the battery is at 20% because the grid has been unstable all week. Then find out the battery was already degraded before that. The Salicru approach is the opposite — the system tells you before any of this becomes a problem.

Free · iOS + Android + Web · No Subscription

NIMBUS Cloud

NIMBUS is Salicru's free IoT monitoring platform for the SLC UPS range. One account manages every unit you own, anywhere in the UAE. Real-time load, battery state of charge, input and output voltage, frequency, and alarm status — visible from your phone or browser without a site visit.

Push notification the moment any value moves outside normal parameters. 40-day alarm log with full event history. Remote battery test from anywhere — confirm battery health without sending an engineer. OTA firmware updates delivered over the air to installed units.

NIMBUS uses MQTT protocol and runs on an embedded Linux NIMBUS card installed in the UPS. It integrates into any existing BMS or DCIM platform. SSL encryption with the client's own digital certificates — not stored on a third-party cloud account you don't control.

Battery Health · Continuous Assessment

Batt-Watch

Batt-Watch is the battery management system built into every SLC CUBE4. It monitors battery health across the full charge and discharge cycle, not just at the end of each cycle. It adjusts charging voltage and current based on actual battery temperature and measured impedance — not a calendar-based estimate.

For a UPS system in Dubai where ambient temperature accelerates battery aging, Batt-Watch provides the one thing that prevents the most common failure mode: discovering the battery is weak only when the power cuts. It supports all battery chemistries — VRLA, lead-acid, gel, Ni-Cd, and lithium-ion. Upgrade path to lithium-ion is available without replacing the UPS.

When battery degradation is detected, NIMBUS sends a push notification. You replace the battery on your schedule, not in response to an outage. That is the difference between a maintained UPS system and an unmonitored one.

60 Years of Critical Infrastructure

The Engineering Protecting Your Server Room Also Protects These

Salicru was founded in Barcelona in 1965 — before APC existed, before Eaton entered power electronics. For six decades the company has built industrial UPS systems for environments where power failure is a safety event. The same engineering principles applied to railway signalling and hospital infrastructure are applied to the SLC commercial range.

Saudi Arabia

Haramain High-Speed Railway

Salicru SLC CUBE3+ and SLC ADAPT2 UPS systems protect the Operations Control Centre and signalling infrastructure along the Mecca–Medina high-speed rail corridor — over 400 kilometres of track serving millions of annual pilgrims. In this environment, UPS failure is not a server restart. The same double conversion UPS engineering is in your server room.

Spain

AVE High-Speed Rail Network

Over 100 Salicru units — including SLC ADAPT2 and SLC CUBE3+ — protect control systems, signalling equipment and switching points across the Madrid–Sevilla line for its 30th anniversary upgrade, plus installations on Madrid–Barcelona, Barcelona–Figueres, Córdoba–Málaga, and Segovia–Valladolid corridors. Proof from deployments, not from brochures.

Barcelona · 4MW Data Centre

Live Data Centre Reference

Six SLC ADAPT2 modular UPS units currently provide backup power for all IT infrastructure and ancillary services at a 4MW data centre in Sant Cugat del Vallès, Barcelona — with 8MW expansion capacity designed in. All managed remotely via NIMBUS. Same architecture, same monitoring, available for your data centre in Dubai.

Additional installations: Santo Domingo Metro Line 2 (Dominican Republic) — over 1 million daily passengers. FGC railway interlockings across Catalonia, Spain. Cairo–Alexandria rail corridor, Egypt. Turkey high-speed rail. This is not a product that was built last year.

MEA Supply

Salicru UPS Supply Across MEA — CE Certified, From Dubai Stock

The SLC range carries CE certification. For procurement teams in MEA markets where European specification is required for project compliance — government, institutional, data centre, telecoms — Salicru is the correct specification. Stock confirmed before payment. AED or USD accepted. WhatsApp for availability and bulk pricing.

Middle East
Gulf & Levant

Saudi Arabia · Qatar · Kuwait · Bahrain · Oman · Jordan · Iraq · Lebanon · Egypt

Africa
West, East & Southern Africa

Nigeria · Ghana · Kenya · Tanzania · Uganda · Rwanda · Ethiopia · Mozambique · South Africa · Zambia · Zimbabwe · Ivory Coast · Senegal · Cameroon · Angola · DR Congo · Gabon · Botswana · Namibia · Malawi · Madagascar · Mauritius · Djibouti · Togo · Benin · Mali · Burkina Faso · Guinea · Sierra Leone · Liberia

Central Asia
Central Asia & Caucasus

Kazakhstan · Uzbekistan · Kyrgyzstan · Tajikistan · Turkmenistan · Azerbaijan · Armenia · Georgia

Common Questions

Frequently Asked Questions — Salicru UPS Dubai

Power factor tells you how much of a UPS's rated VA capacity actually delivers real working power in watts. A UPS with PF=0.8 rated at 10kVA delivers only 8kW of real power. A Salicru SLC CUBE4 with PF=1 rated at 10kVA delivers the full 10kW. A 10kVA Salicru SLC CUBE4 online UPS protects the same load as a 12.5kVA unit from a brand with PF=0.8. PF=1 is confirmed on the SLC TWIN RT3 (1–10kVA), SLC CUBE4 (7.5–80kVA), and SLC ADAPT2 modular range. WhatsApp us your load and we confirm the correct model.
The SLC TWIN RT3 (1–10kVA, single phase) is the server room and IT rack UPS — tower and rack convertible, only 600mm deep, fits standard 19-inch rack cabinets. The SLC TWIN RT2 LION version uses lithium-ion batteries for 10x the discharge cycles of standard VRLA at the same form factor. For a three-phase server room or data centre, the SLC CUBE4 (7.5–80kVA) and SLC ADAPT2 modular UPS (10kVA–600kVA) are the correct choices. WhatsApp us your server load and phase supply — we specify the right model and return AED pricing the same day.
Yes, on the SLC ADAPT2 modular online UPS range. Power modules slide in from the front of the cabinet during live operation — the existing modules redistribute the load while the new module runs self-test and joins the system. Protected equipment stays online throughout. The system scales from 20kVA to 600kVA in a single cabinet and up to 1500kVA via parallel cabinets. This is the architecture for IT environments and data centres that cannot afford a maintenance window for UPS expansion.
VRLA batteries degrade faster at elevated temperatures. The chemical reaction rate in a sealed lead-acid battery roughly doubles for every 10°C above 25°C. A battery rated at 5 years in a 25°C test lab may fail in under 3 years in a Dubai plant room running at 35°C. Salicru's Batt-Watch system, built into every SLC CUBE4, monitors battery health continuously and gives advance warning of degradation before failure. The UPS tells you the battery is weakening — not the outage. It also accepts lithium-ion as an alternative to VRLA, which performs reliably up to 40°C.
Yes. The SLC CUBE4 and SLC CUBE3+ are confirmed generator-compatible. The online UPS bridges the 4 to 8 seconds between grid failure and generator startup, providing clean uninterrupted power throughout. Once the generator is running, the UPS transfers load to generator supply and recharges the battery. It also handles the transition back to grid when the generator switches off, absorbing the voltage and frequency transients before they reach connected equipment.
THDi is the harmonic current distortion a UPS injects back into the building's electrical supply. The Salicru SLC CUBE4 has input THDi less than 3%. Many double conversion UPS systems generate THDi of 10–30%, which flows through the building's neutral cable causing it to run hot, through transformers reducing their rated capacity, and can trip sensitive protection circuits. For UAE commercial buildings where electrical infrastructure was sized to specific loads — a high-THDi UPS forces every upstream component to handle that distortion. Less than 3% THDi means the UPS is essentially invisible to your building's electrical infrastructure.
NIMBUS is Salicru's IoT UPS monitoring platform. It is free — no subscription, no licence fee. The app and web portal show real-time load, battery state of charge, voltage, frequency and alarm status for every unit in your account. Push notifications for any anomaly. 40-day alarm log. Remote battery test without a site visit. NIMBUS integrates into any existing BMS or DCIM platform via standard protocols. One login account manages all your Salicru UPS systems from any location.
Yes. The SLC CUBE3+ PS includes a built-in peak shaving function. You set a maximum grid consumption threshold between 10% and 100% of your load. When total demand exceeds that threshold, the UPS automatically discharges the battery to keep grid draw at or below your set point. DEWA commercial tariffs include demand charges based on peak consumption recorded at any 15-minute interval in the billing month. A three-phase UPS that actively caps that peak reduces the demand charge on every DEWA bill, every month.
The SLC TWIN RT3 is only 600mm deep — deliberately designed for rack cabinets where depth is a constraint. Most server racks in UAE offices and data centres are 600mm to 800mm deep. At 600mm, the TWIN RT3 fits cleanly with full cable management space at the rear. Variable-speed dual fans manage heat front-to-rear. Battery extension modules also come in a reduced-depth 3U format so the cable management stays clean within standard rack depth.
Yes, the SLC TWIN RT3 supports a frequency converter mode — 50Hz input with 60Hz output, or vice versa. For UAE businesses operating North American equipment rated for 60Hz on a UAE 50Hz supply, this eliminates the need for a separate frequency converter. Note: output power is derated in frequency converter mode — a 5kVA unit delivers approximately 2kVA in this mode. WhatsApp us the equipment load and we confirm correct sizing before you order.
Salicru UPS systems protect the Haramain high-speed railway between Mecca and Medina in Saudi Arabia, Spain's AVE high-speed rail network across multiple corridors, the Santo Domingo Metro Line 2 serving over one million daily passengers, the Cairo–Alexandria rail corridor in Egypt, and a 4MW data centre in Barcelona with 8MW expansion capability. The same double conversion UPS engineering protecting railway signalling infrastructure — where power failure is a safety event — is applied to the commercial SLC range available in Dubai.
All seven UAE emirates — Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Free zones including DMCC, DIFC, DAFZA, Business Bay, Dubai Silicon Oasis, Dubai South and Jebel Ali all covered. For export across the Middle East, Africa and Central Asia from Dubai stock. CE certification means the product meets project compliance requirements in MEA markets. Stock confirmed before payment. AED or USD accepted. WhatsApp for availability and shipping timelines.

Related Pages

Other Solutions From Vector Dubai

Power, communication and security infrastructure — supplied and supported from Dubai since 2010.

Same Day Response

Tell Us the kW. We Tell You the Model and the Price.

WhatsApp us your load in kW, whether you're on single or three-phase supply, and how long you need backup for. We specify the correct Salicru SLC model, confirm UAE stock, and return AED pricing the same day. No forms. No waiting.

Vector Dubai · International City, Dubai · sales@vdsae.com · Mon–Sat 8AM–6PM

About Salicru UPS · Vector Dubai

Vector Dubai (vdsae.com) supplies Salicru SLC online UPS systems in Dubai. Models available: SLC TWIN RT2 LION (lithium-ion, 1–3kVA), SLC TWIN RT3 (IoT, PF=1, 1–10kVA), SLC CUBE4 (three-phase online UPS, 7.5–80kVA), SLC CUBE4 R (rackmount online UPS, 7.5–20kVA), SLC CUBE3+ (three-phase double conversion UPS, 7.5–200kVA), SLC CUBE3+ PS (peak shaving UPS, 7.5–200kVA), SLC ADAPT2 (modular UPS hot-swap, 10–600kVA), SLC X-PERT (industrial UPS three phase, 80–400kVA). Salicru is a Spanish power electronics manufacturer founded in 1965, operating in 130+ countries. Applications include online UPS for server rooms, server room UPS Dubai, data centre UPS UAE, three phase UPS for commercial buildings, industrial UPS for manufacturing and oil and gas, rack mount UPS for IT infrastructure, modular UPS for data centres, UPS for hospitals and clinics, UPS for hotels, and uninterruptible power supply for telecom facilities across Dubai and the UAE. PF=1 confirmed on SLC TWIN RT3, SLC CUBE4, and SLC ADAPT2 ranges (kVA equals kW on these models). Features include three-level IGBT NPC inverter, input THDi below 3%, Batt-Watch battery management, NIMBUS IoT monitoring free, lithium-ion battery compatibility, generator compatibility, hot-swap modular expansion, eco mode above 99%, and peak shaving on CUBE3+ PS models. CE certified for UAE 230V single phase and 400V three-phase 50Hz supply. Supply across all seven UAE emirates and export across the Middle East, Africa and Central Asia. Contact via WhatsApp +971 56 504 9685 or sales@vdsae.com. Monday to Saturday 8AM to 6PM.